Freeze Service

Dynamic Freeze Well Workover

Wild Well was recently contacted by a MENA regional client who was facing challenges in achieving a double barrier to the wellbore that would allow them to perform a live-well workover on a gas well. The OEM’s equipment design utilized a single barrier tubing hanger seal that was standard issue for the era when it was installed. While single barriers may have been acceptable in the past, they do not meet the standards of our client’s HSE compliance and their well integrity requirements of today. Learn More